Response to LGOIMA request 2023-064 26 April 2023
Search in document library
Request for information:
- "Why did the GWRC not come out and inspect the breaches that were occurring?
- Has the GWRC ever heard of noise control never coming out? And if not why do they believe that the response to these two discharges are acceptable?
- (sic) What action has been taken against Interwaste for the constant breaches of their discharge permit over the past 5 years?
- I'd like a copy of all the smelt complaints made against Interwaste along with the actions that the GWRC has taken against each complaint"