-
Stormwater contaminants in urban streams in the Wellington region
PREPARED BY: J R Milne &L Watts (Greater Wellington Regional Council)
alarm Published 01 Jun 2008 -
-
Rural Services Newsletter - May/June 2008
Rural services newsletter for May/June 2008.
alarm Published 05 May 2008 -
Castlepoint Beach: Fine Scale Monitoring 2007/2008
This report summarises the results of the 2008 fine scale
monitoring for Castelpoint Beach, a 4.5km long, exposed,
and gradually sloping beach (intermediate - dissipative
type) on the Wairarapa Coast.…There is no digital version of this document available, but you can get in touch with publications@gw.govt.nz to get a copy of the document.
alarm Published 01 May 2008 -
Instream Flow Assessment for the Otukura Stream Stage 2: Instream Flow Requirements
In this report the instream flow requirements of the Otukura
Stream are assessed with the objective of improving
ecological values. The model WAIORA is used to investigate
the relationship between stream…alarm Published 01 May 2008 -
Pollution Control Annual Report 2006-07
This report presents a summary and analysis of the
environmental incident complaints for the Wellington
Region from 2006 to 2007.alarm Published 01 May 2008 -
Whareama Estuary: Fine Scale Monitoring 2007/2008
This report presents the findings of fine scale monitoring at
two intertidal sites in the Whareama Estuary, a 12km long
tidal river estuary on the Wairarapa Coast. This…alarm Published 01 May 2008 -
Draft Regional Policy Statement for the Wellington region 2008
Draft Regional Policy Statement (2008)
alarm Published 31 Mar 2008 -
Regional Policy Statement review newsletter No 4: March 2008
Draft Regional Policy Statement released
The draft Regional Policy Statement is all about sustainable management. This means ensuring the way we use resources today doesn’t compromise the ability of future generations…alarm Published 31 Mar 2008 -
Resource Consent Annual Compliance Summary 2006-2007
This summary is based on resource consent monitoring
undertaken by Greater Wellington between 1 July 2006
and 30 June 2007. Monitoring is undertaken to check
consent holders are meeting the…alarm Published 27 Mar 2008